NavArch Handbook
Chapter 4 / Section 4.9
The wetted surface [m²] is needed for frictional resistance (Chapter 6), paint area and shell-plating weight. It is computed exactly by integrating the girths of the sections (Simpson's rule on girth × station spacing, with a correction for the longitudinal slope of the surface), or estimated from the formulas below.
where is the half-girth of the section from keel to waterline and – accounts for the obliquity of the surface at the ends.
with the transverse bulb area at the FP (zero without bulb). Coefficients , , are based on . 3. Taylor: with – for merchant forms (dimensionless when in m³ and in m).
Appendages (rudder, bilge keels, shaft brackets) are added separately — typically 2–5 % of the hull wetted surface.
| Symbol | Description | Unit |
|---|---|---|
| Wetted surface of the bare hull | m^2 | |
| Length on waterline (or L_BP) | m | |
| Mean draught | m | |
| Displacement volume | m^3 |
Result unit m^2
±5 % for conventional forms.
| Symbol | Description | Unit |
|---|---|---|
| Transverse sectional area of bulbous bow at FP (0 if none) | m^2 | |
| Form coefficients on L_WL | - |
Result unit m^2
Holtrop, J. & Mennen, G.G.J., 'An approximate power prediction method', International Shipbuilding Progress, Vol. 29 (1982).
| Symbol | Description | Unit |
|---|---|---|
| Wetted surface coefficient (2.5–2.7 merchant; up to 2.9 fine forms) | - |
Result unit m^2
Worked example
Problem
m, m, m, m³, (on ), , (on ), no bulb.