When a mass is lifted by a crane or derrick, its weight acts at the head of the jib (the point of suspension), not at the hook or at the load. The instant the load leaves the quay (or the deck), the ship's rises as if had been placed at the jib head height :
(if the load was already on board on deck at , the virtual rise is at constant displacement.)
Applies to ships engaged in lifting where the lift causes a significant heel (criterion in 2.9.1). Two alternative approaches are given:
| Symbol | Description | Unit |
|---|---|---|
| Mass of the lifted load | t | |
| Height of the point of suspension (jib head) above baseline | m | |
| Displacement and KG before the lift | t, m |
Result unit m
| Symbol | Description | Unit |
|---|---|---|
| Height of the load before lifting | m |
Result unit m
| Symbol | Description | Unit |
|---|---|---|
| Transverse outreach of the jib head from centreline | m | |
| Metacentric height with the suspended load | m |
Result unit deg
| Symbol | Description | Unit |
|---|---|---|
| Anti-heeling ballast mass and its transverse position (opposite side) | t, m |
Result unit t·m
| Quantity | Typical limit | Source |
|---|---|---|
| Heel during lift (with counter-ballast) | ≤ 5°–10° (often 5° in operation manuals) | IS Code Part B 2.9; DNV crane vessel notations |
| Residual GM with load suspended | > 0 (simplified) / usually ≥ 0.15–0.5 m per operator | IS Code Part B 2.9.3; operator procedures |
| Heel after sudden load loss | ≤ 15° or deck-edge immersion / downflooding | IS Code Part B 2.9.2 |
| Freeboard at the low side | Not less than a stated minimum (e.g. 0.5 m to the deck edge) | Administration / operator |
| Dynamic hook load factor for structure | 1.1–1.3 (harbour/offshore) depending on crane class | DNV-ST-0378 Sec. 4 |
Worked example
Problem
Example vessel: t, m. The deck crane lifts an 80 t item from the quay with the jib head at m above baseline and an outreach m. at 6394 t is 5.95 m. Find during the lift and the heel without counter-ballast; then the counter-ballast required at 6.5 m off centreline to limit heel to 3°.
Mandatory where the Administration applies Part B to the ship type.
For the crane structure and foundation; stability is governed by Pt.3 Ch.15 and the IS Code.