Chapter 5 / Section 5.11
Dry-docking and grounding
The critical instant
When a ship with stern trim enters a dry dock, the stern (the sternframe or the aft end of the keel) touches the blocks first. From that moment, as the water falls, part of the ship's weight is carried by the blocks. The upward reaction at the keel acts below G and behaves like a mass removed from the keel level: it causes a virtual rise of G and a loss of GM. The critical instant is just before the ship touches the blocks along the whole keel ("sewing"), when is greatest and the ship is still afloat enough to heel.
Block reaction at the critical instant
The ship must trim to level keel by the moment the keel takes the blocks along its length. The moment required is where is the distance from the LCF to the point of contact (aft end of keel); it must equal the trimming moment that removes the trim [cm]:
Loss of GM
Two formulations are in use; both are acceptable, the first is slightly conservative:
The effective metacentric height at the critical instant is and must remain positive (yards typically require ≥ 0.3 m or a minimum trim limit from the docking plan). should be taken at the reduced displacement for the first formula.
Grounding
Grounding on a point (rock, bank) is analysed in the same way: the ground reaction at the point of contact replaces the block reaction; its position is generally off-centre and gives a heeling moment in addition to the GM loss. For a ship aground with falling tide, grows as (fall of water level in cm) when the ship is on a flat bottom, with the appropriate trim correction when aground at one point.
Practical checks in a docking plan
- Trim within the limit given in the docking plan (e.g. ≤ 1 m by the stern); no list.
- Free surfaces minimised; tanks pressed up or empty as specified.
- Effective GM at the critical instant positive with margin.
- Block loading and sue (undocking) sequence; keel strength check at the point of first contact.
Formulas
| Symbol | Description | Unit |
|---|---|---|
| Upthrust from the blocks at the aft end of keel | t | |
| Trim by the stern on entering the dock | cm | |
| Distance from the point of contact (aft end of keel) to the LCF | m | |
| Moment to change trim 1 cm | t·m/cm |
Result unit t
| Symbol | Description | Unit |
|---|---|---|
| Height of metacentre at the reduced displacement Δ − P | m |
Result unit m
Result unit m
Treats P as a mass removed at the keel. Slightly less conservative than the KM form.
Result unit m
| Symbol | Description | Unit |
|---|---|---|
| Fall of water level since touching | cm |
Result unit t
Examples
Dry-docking of the example vessel
Worked example
Problem
The vessel enters dock with t, trim 60 cm by the stern, t·m/cm, LCF 0.88 m forward of midship, fluid m, m. The aft end of the keel is at the AP. Find at the critical instant and the effective GM.
References
Version 2 · last updated 19 Nov 2026 · Editor