Working tools · client-side

Engineering tools

Conversions, first-pass calculations and reference data that follow the relations of the handbook. Every calculation runs in the browser; nothing is sent anywhere.

Displacement from coefficients

∇ = C_B · L · B · T · (1 + appendage %) Δ = ρ · ∇

Volume of displacement ∇6221.600m³
Displacement Δ6377.140t

TPC and FWA

TPC = ρ · A_WP / 100 FWA = Δ / (4 · TPC) DWA = FWA · (1025 − 1000·ρ_dock) / 25

Waterplane area used720.000m²
TPC7.380t/cm
Fresh water allowance FWA213.9mm
Dock water allowance DWA128.3mm

GM and list

GM_solid = KM − KG GM_fluid = GM_solid − ΣFSM/Δ tan θ = w·d / (Δ · GM_fluid)

GM solid0.770m
Virtual rise of G (ΣFSM/Δ)0.069m
GM fluid0.701m
List angle θ5.16deg

Trim change

δt = M / MCT1cm δT_F = δt·(L/2 − x_F)/L δT_A = −δt·(L/2 + x_F)/L sinkage = w / TPC

Trimming moment3000.0t·m
Change of trim50.17cm
Change forward24.64cm
Change aft-25.53cm
New draught forward5.546m
New draught aft5.445m
New trim (aft − forward)-0.102m

Positive change of trim is by the head. For masses above about 10 % of the displacement use the hydrostatics at the new displacement and iterate.

Simpson integrator

A = (h/3)·Σ(SM·y) x̄ = h·Σ(SM·i·y) / Σ(SM·y)

11 ordinates · 10 intervals1st rule applies2nd rule n/a

Simpson's first rule

Area (h × ordinate unit)147.200
Centroid from first ordinate29.022same unit as h

Trapezoidal rule

Area (h × ordinate unit)146.400
Centroid from first ordinate29.066same unit as h

IS Code GZ check

A₀₋₃₀ = 3h/8·(GZ₀+3GZ₁₀+3GZ₂₀+GZ₃₀) A₀₋₄₀ = h/3·(GZ₀+4GZ₁₀+2GZ₂₀+4GZ₃₀+GZ₄₀)

CriterionRequiredComputedResult
Area 0–30°≥ 0.055 m·rad0.1166Pass
Area 0–40°≥ 0.090 m·rad0.2092Pass
Area 30–40°≥ 0.030 m·rad0.0926Pass
Maximum GZ≥ 0.20 m0.537mPass
Angle of maximum GZ≥ 25°38.6°Pass
Initial GM0 (fluid)≥ 0.15 m0.700mPass

Indicative check for study purposes; compliance calculations must be done with approved software and the full set of criteria.